Suspended platform,suspended scaffolding manufacturer,Gigid China

Suspended platform (all models)

suspended platform swing stage,temporary suspended platforms

suspended platform equipment including hosit,working platform,suspension mechanismparts of suspended platform

Suspended platform(or suspension platform access system), as temporary suspended cradle platform, are widely applied in  maintenance applications such as curtain fecade cleaning in high rise building, painting,glazing repairs, bill- board painting, cable installation and other outer working of high rise building up to 150 meters about 30 floors high. Our ZLP series suspended platform cradle, ZLP-1000, ZLP-800, ZLP-630, ZLP-500 and ZLP-250, are good choice for fulfill above outside of wall work.

The specification of Suspended Platform (suspension platform)

SPECIFICATIONZLP-1000ZLP-800ZLP-630ZLP-500ZLP-250
Schedule Weight
(Kg)
1000800630500250
Hoisting Speed
9m/min9m/min9.3m/min9.3m/min9.3m/min
Volatage-3phase380V(415V/220V)380V(415V/220V)380V(415V/220V)380V(415V/220V)380V(415V/220V)
Rated Power(kw)1.8x2KW1.8x2KW1.5x2KW1.1x2KW1.1
Hoist
LTD100LTD80LTD63LTD50LTD50
Safety Lock
LSF310LSF309LSF308LSF308LSF308
Wire rope type
4 x31SW+FC
-10.2mm
Diameter:10.2mm
4 x31SW+FC
-9.1mm
Diameter:9.1mm
4 x31SW+FC
-8.3mm
Diameter:8.3mm
4 x31SW+FC
-8.3mm
Diameter:8.3mm
4 x31SW+FC
-8.3mm
Diameter:8.3mm
Working Platform Dimensions(mm)
L x W * H
(2500×3)
x760
x1450mm
(2500×3)
x760
x1450mm
(2000×3)
x760
x1450mm
(2500×2)
x760
x1450mm
1200
x650
x2300mm
Hanging Device
Weight(Kg)
360360360360180
Lifting Part Weight
(Kg)
530(Steel)
480(Alu)
530(Steel)
380(Alu)
480(Steel)
340(Alu)
410(Steel)
290(Alu)
200(Steel)
140(Alu)
Counter Weight(KG)1200 (48PCS)1000(40PCS)900(36PCS)800(32PCS)350(14PCS)
Qty of package(20'GP)88101213

The above specification is our standard ones, for voltage, frequency, worktable length can be custom-built as per your country’s requirement.Components of working platform  are aluminum, hot dipped galvanized steel,and  powered coating steel.
Optional function:
1.Overload sensor inside the hoist
2.Phase controller

Maybe you have different require for the structure of working platform and anchoring on roof ,please visit the website:

Structure of working platform and anchoring on roof 

Have any question, Please enter the form below and click the submit button.

3 + 7 = ?
Please enter the answer to the sum & Click Submit to verify your registration.

Related Items

  • Product Categories

  • Slideshow

  • Latest Update